• Title of article

    Possibilities of implementation of absorption heat pump in realization of the Clausius–Rankine cycle in geothermal power station

  • Author/Authors

    Wladyslaw Nowak، نويسنده , , Aleksander A. Stachel، نويسنده , , Aleksandra Borsukiewicz-Gozdur، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2008
  • Pages
    6
  • From page
    335
  • To page
    340
  • Abstract
    The topic of utilization of geothermal power for heating purposes in Poland is relatively well known, which is justified by the fact of a number of operating geothermal power plants and some other installations in a well advanced design stage. Geothermal energy utilization projects for production of electricity are also under development. The results of one of such analysis, regarding the correctness of construction and operation of a binary geothermal power plant in combination with the heat pump, supplied by heat water with low enthalpy, has been discussed in the present paper.
  • Keywords
    Geothermal energy , Heat pump , Binary power plant , Geothermal energy utilization
  • Journal title
    Applied Thermal Engineering
  • Serial Year
    2008
  • Journal title
    Applied Thermal Engineering
  • Record number

    1041527