Title of article
Possibilities of implementation of absorption heat pump in realization of the Clausius–Rankine cycle in geothermal power station
Author/Authors
Wladyslaw Nowak، نويسنده , , Aleksander A. Stachel، نويسنده , , Aleksandra Borsukiewicz-Gozdur، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2008
Pages
6
From page
335
To page
340
Abstract
The topic of utilization of geothermal power for heating purposes in Poland is relatively well known, which is justified by the fact of a number of operating geothermal power plants and some other installations in a well advanced design stage. Geothermal energy utilization projects for production of electricity are also under development. The results of one of such analysis, regarding the correctness of construction and operation of a binary geothermal power plant in combination with the heat pump, supplied by heat water with low enthalpy, has been discussed in the present paper.
Keywords
Geothermal energy , Heat pump , Binary power plant , Geothermal energy utilization
Journal title
Applied Thermal Engineering
Serial Year
2008
Journal title
Applied Thermal Engineering
Record number
1041527
Link To Document