Title of article
Generalized Cyclic Open Shop Scheduling and a Hybrid Algorithm
Author/Authors
Modarres، Mohammad نويسنده Industrial Engineering Department Modarres, Mohammad , Ghandehari، Mahsa نويسنده ,
Issue Information
فصلنامه با شماره پیاپی سال 2008
Pages
15
From page
345
To page
359
Abstract
In this paper, we first introduce a generalized version of open shop scheduling (OSS), called
generalized cyclic open shop scheduling (GCOSS) and then develop a hybrid method of
metaheuristic to solve this problem. Open shop scheduling is concerned with processing n
jobs on m machines, where each job has exactly m operations and operation i of each job
has to be processed on machine i . However, in our proposed model of GCOSS, processing
each operation needs more than one machine (or other resources) simultaneously. Furthermore,
the schedule is repeated more than once. It is known that OSS is NP-hard. Therefore, for
obtaining a good solution for GCOSS, which is obviously NP-hard, a hybrid algorithm is also
developed. This method is constructed by hybridizing ant colony optimization (ACO), beam
search and linear programming (LP). To verify the accuracy of the method, we also compare
the results of this algorithm with the optimal solution for some special problems.
Journal title
Journal of Industrial and Systems Engineering (JISE)
Serial Year
2008
Journal title
Journal of Industrial and Systems Engineering (JISE)
Record number
1087431
Link To Document