Title of article :
Scheduling Accumulated Rework in a Normal Cycle: Optimal Batch Production with Minimum Rework Cycles
Author/Authors :
Haji، Babak نويسنده , , Haji، Alireza نويسنده , , Rahmati Tavakol، Ali نويسنده ,
Issue Information :
فصلنامه با شماره پیاپی سال 2008
Abstract :
In this paper we consider a single machine system that produces items part of which are
defective. The defective items produced in a time period, consisting of several equal cycles, are
accumulated and are all reworked in the last cycle of this period called the rework cycle. At the
end of the rework cycle the whole process will start all over again.
The first significant objective of this study is that, for the ease of production and resource
planning, the rework cycle has to have the same length as the other cycles. The other objective
is that the number of rework cycles be as small as possible, because of changeover costs needed
for going from normal production to rework as well as special attention required for rework to
satisfy the zero defect criterion. For this system, assuming no shortages are permitted we drive
the total system cost per unit time and obtain the economic batch quantity which minimizes this
total cost.
Journal title :
Journal of Industrial and Systems Engineering (JISE)
Journal title :
Journal of Industrial and Systems Engineering (JISE)