Title of article
Development of a Set of Algorithms for the Multi-Project Scheduling Problems
Author/Authors
Tari، Farhad Ghassemi نويسنده Department of Industrial Engineering Tari, Farhad Ghassemi , Olfat، Laya نويسنده ,
Issue Information
فصلنامه با شماره پیاپی سال 2007
Pages
14
From page
23
To page
36
Abstract
In this paper, the problem of determining the best schedule for a set of projects has been
modeled in the form of a generalized tardiness flowshop (GTF) problem. We develop a set of
heuristic algorithms for minimizing the total tardiness of jobs in a GTF problem. In the
generalized version of tardiness flowshop problems, a job is considered to be a collection of
operations and there is a due date associated with the completion of each operation on each
machine. Four algorithms based on the concept of “apparent tardiness cost” (ATC) are
developed for solving the GTF problem. The relative effectiveness of the developed algorithms
will then be evaluated through an extensive computational experiment.
Journal title
Journal of Industrial and Systems Engineering (JISE)
Serial Year
2007
Journal title
Journal of Industrial and Systems Engineering (JISE)
Record number
1092320
Link To Document