A Project Scheduling Method Based on Fuzzy Theory
Author/Authors
Soltani Nejad، Ahmad نويسنده , , Haji، Rasoul نويسنده ,
Issue Information
فصلنامه با شماره پیاپی سال 2007
Pages
11
From page
70
To page
80
Abstract
In this paper a new method based on fuzzy theory is developed to solve the project scheduling
problem under fuzzy environment. Assuming that the duration of activities are trapezoidal
fuzzy numbers (TFN), in this method we compute several project characteristics such as earliest
times, latest times, and, slack times in term of TFN. In this method, we introduce a new
approach which we call modified backward pass (MBP). This approach, based on a linear
programming (LP) problem, removes negative and infeasible solutions which can be generated
by other methods in the backward pass calculation. We drive the general form of the optimal
solution of the LP problem which enables practitioners to obtain the optimal solution by a
simple recursive relation without solving any LP problem. Through a numerical example,
calculation steps in this method and the results are illustrated.
Journal title
Journal of Industrial and Systems Engineering (JISE)
Serial Year
2007
Journal title
Journal of Industrial and Systems Engineering (JISE)
Record number
1092325
Link To Document