Title of article
The Ghalilah SWRO plant: an overview of the solutions adopted to minimize energy consumption Original Research Article
Author/Authors
R.L. Stover، نويسنده , , A. Ameglio، نويسنده , , P.A.K. Khan، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2005
Pages
5
From page
217
To page
221
Abstract
The Federal Electricity and Water Authorities (FEWA) SWRO plant in Ghalilah, United Arab Emirates began operation in February 2005. Among the SWRO plants that use advanced energy recovery technology, this plant is the largest SWRO installation in the Arabian Gulf producing three MIGD (13,650 cubic meters) of potable water per day. The Ghalilah plant, designed and built by Fisia Italimpianti, employs ERI Pressure Exchanger technology to save energy and reduce power consumption. The authors describe the challenges and solutions associated with the design, commissioning and operation of the plant, particularly those aspects associated with energy efficiency and energy recovery. Actual performance is compared to predicted performance under various operating conditions.
Keywords
SWRO , Energy recovery , Seawater reverse osmosis , Pressure exchanger
Journal title
Desalination
Serial Year
2005
Journal title
Desalination
Record number
1109438
Link To Document