• Title of article

    A feasibility study of industrial wastewater recovery using electrodialysis reversal Original Research Article

  • Author/Authors

    Yu-Mei Chao، نويسنده , , T.M Liang، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2008
  • Pages
    7
  • From page
    433
  • To page
    439
  • Abstract
    A wastewater reclamation and reuse “mini-plant” was established at the site of China Steel Corporation (CSC) wastewater treatment plant. The purpose of the mini-plant is to demonstrate the technical and economical feasibility of electrodialysis reversal (EDR) process. The mini-plant includes a sand filtration unit and an EDR unit which has a daily treatment capacity of 350 CMD. Raw wastewater had an averaged conductivity of 3860 μS/cm, pH between 7.7 and 8.3, and COD between 30 and 70 mg/L. When the EDR unit operates at a 75% of water reclamation rate, 92% of desalination rate, 98% of chlorine ion removal, 80% of sulfate removal, 99% of calcium ion removal, and 51% of COD removal rate can be achieved. The water quality of product stream is 305 μS/cm for conductivity, 13 mg/L for chlorine ion, 86 mg/L for sulfate, 1.4 mg/L for calcium ion, and of 20 mg/L for COD concentration.
  • Keywords
    Electrodialysis reversal , Reuse , Wastewater reclamation
  • Journal title
    Desalination
  • Serial Year
    2008
  • Journal title
    Desalination
  • Record number

    1111359