Budgetary Constraints and Idle Time Allocation in Common-Cycle Production with non-zero Setup Time
Author/Authors
Haji، Rasoul نويسنده , , Haji، Alireza نويسنده , , ARDALAN، ALI نويسنده ,
Issue Information
فصلنامه با شماره پیاپی سال 2010
Pages
15
From page
18
To page
32
Abstract
Economic lot size scheduling problem (ELSP) for a multi-product single machine system is a
classical problem. This paper considers ELSP with budgetary constraint as an important aspect of
such systems. In the real world situations the available funds for investment in inventory is limited.
By adopting the common cycle time approach to ELSP, we obtain the optimal common cycle which
minimizes the total inventory ordering and holding costs for the case of nonzero setup times. One
aspect of the scheduling is to decide what should be the sequence of production runs and how the
idle times shall be distributed in the common cycle time. For such a sequencing problem, we
consider two cases: a) the common cycle time is given, and b) the common cycle time is a decision
variable. In the literature, scheduling rules are introduced for both cases, which assume that the total
idle time is located at the end of each cycle. This paper relaxes this assumption and provides: i) a
rule to optimize the production sequence and the length of idle times before (or after) producing
each item, for both cases (a) and (b), and ii) the optimal common cycle for case (b). The presented
rule is interestingly general, simple and easy-to-apply.
Journal title
Journal of Industrial and Systems Engineering (JISE)
Serial Year
2010
Journal title
Journal of Industrial and Systems Engineering (JISE)
Record number
1151073
Link To Document