Abstract :
In system planning and operation considerable efforts and resources are spent to reduce uncertainties, as a part of project management, uncertainty management and safety management. The basic idea seems to be that uncertainties are purely negative and should be reduced. In this paper we challenge this way of thinking, using a common industry practice as an example. In accordance with this industry practice, three uncertainty interval categories are used: ±40% intervals for the feasibility phase, ±30% intervals for the concept development phase and ±20% intervals for the engineering phase. The problem is that such a regime could easily lead to a conservative management regime encouraging the use of existing methods and tools, as new activities and novel solutions and arrangements necessarily mean increased uncertainties. In the paper we suggest an alternative approach based on uncertainty and risk descriptions, but having no predefined uncertainty reduction structures. The approach makes use of risk assessments and economic optimisation tools such as the expected net present value, but acknowledges the need for broad risk management processes which extend beyond the analyses. Different concerns need to be balanced, including economic aspects, uncertainties and risk, and practicability.
Keywords :
Predefined uncertainty intervals , Uncertainty management , Cost-benefit analysis , Project planning phases , Risk assessment , Production assurance
Journal title :
Reliability Engineering and System Safety
Serial Year :
2009
Journal title :
Reliability Engineering and System Safety
Record number :
1187981
Link To Document :
بازگشت