• Title of article

    A combined usage of stochastic and quantitative risk assessment methods in the worksites: Application on an electric power provider

  • Author/Authors

    P.K. Marhavilas، نويسنده , , D.E. Koulouriotis، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2012
  • Pages
    11
  • From page
    36
  • To page
    46
  • Abstract
    An individual method cannot build either a realistic forecasting model or a risk assessment process in the worksites, and future perspectives should focus on the combined forecasting/estimation approach. The main purpose of this paper is to gain insight into a risk prediction and estimation methodological framework, using the combination of three different methods, including the proportional quantitative-risk-assessment technique (PRAT), the time-series stochastic process (TSP), and the method of estimating the societal-risk (SRE) by F–N curves. In order to prove the usefulness of the combined usage of stochastic and quantitative risk assessment methods, an application on an electric power provider industry is presented to, using empirical data.
  • Keywords
    Stochastic processes , Quantitative risk assessment , Time series , Societal risk , FN curves , Risk criteria
  • Journal title
    Reliability Engineering and System Safety
  • Serial Year
    2012
  • Journal title
    Reliability Engineering and System Safety
  • Record number

    1188402