Title of article
A combined usage of stochastic and quantitative risk assessment methods in the worksites: Application on an electric power provider
Author/Authors
P.K. Marhavilas، نويسنده , , D.E. Koulouriotis، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2012
Pages
11
From page
36
To page
46
Abstract
An individual method cannot build either a realistic forecasting model or a risk assessment process in the worksites, and future perspectives should focus on the combined forecasting/estimation approach. The main purpose of this paper is to gain insight into a risk prediction and estimation methodological framework, using the combination of three different methods, including the proportional quantitative-risk-assessment technique (PRAT), the time-series stochastic process (TSP), and the method of estimating the societal-risk (SRE) by F–N curves. In order to prove the usefulness of the combined usage of stochastic and quantitative risk assessment methods, an application on an electric power provider industry is presented to, using empirical data.
Keywords
Stochastic processes , Quantitative risk assessment , Time series , Societal risk , FN curves , Risk criteria
Journal title
Reliability Engineering and System Safety
Serial Year
2012
Journal title
Reliability Engineering and System Safety
Record number
1188402
Link To Document