• Title of article

    A fuzzy time-dependent project scheduling problem

  • Author/Authors

    Wei Huang، نويسنده , , Sung-Kwun Oh، نويسنده , , Witold Pedrycz، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2013
  • Pages
    15
  • From page
    100
  • To page
    114
  • Abstract
    In this study, we introduce a Fuzzy Time-dependent Project Scheduling Problem (FTPSP), in which activity duration times are represented in the form of fuzzy sets. The duration times are considered to be time-dependent as well. Under these circumstances, the resulting FTPSP becomes far more complex when compared with the existing project scheduling problems. The complexity stems from the fact of computing the completion time of the entire project, a core issue when dealing with project scheduling problems. We first elaborate on the difficulties with the computing of the completion time. Subsequently, we develop a computational formula for estimating the overall completion time of FTPSP. Next, we formulate the FTPSP and propose three fuzzy programming models to address various requirements arising within this framework. The proposed models are handled through techniques that combine mechanisms of fuzzy simulation and genetic optimization. In this setting, fuzzy simulation is exploited to estimate the value of uncertain functions that do not exist in conventional certain project scheduling problems. Numerical experiments are included to illustrate the effectiveness of the algorithm.
  • Keywords
    project scheduling , Fuzzy programming , genetic algorithm
  • Journal title
    Information Sciences
  • Serial Year
    2013
  • Journal title
    Information Sciences
  • Record number

    1215770