• Title of article

    A multiple-case design methodology for studying MRP success and CSFs

  • Author/Authors

    James S.K. Ang، نويسنده , , Chee-Chuong Sum، نويسنده , , Lei-Noy Yeo، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2002
  • Pages
    11
  • From page
    271
  • To page
    281
  • Abstract
    We used a multiple-case design to study materials requirements planning (MRP) implementation outcome in 10 manufacturing companies in Singapore. Using a two-phased data collection approach (pre-interview questionnaires and personal interviews), we sought to develop a comprehensive and operationally acceptable measure of MRP success. Our measure consists of two linked components. They are a satisfaction score (a quantitative measure) and a complementary measure based on comments from the interviewees regarding the level of usage and acceptance of the system. We also extended and consolidated a seven-factor critical success factor (CSF) framework using this methodology. CSFs are important, but knowing the linkages between them is even more important, because these linkages tell us which CSFs to emphasize at various stages of the project.
  • Keywords
    Materials requirements planning (MRP) , Multiple-case design , Critical success factors (CSFs) , MRP implementation outcome
  • Journal title
    Information and Management
  • Serial Year
    2002
  • Journal title
    Information and Management
  • Record number

    1226428