Title of article :
Risk evaluation of tunneling projects
Author/Authors :
M.M. Fouladgar، نويسنده , , A. Yazdani-Chamzini، نويسنده , , E.K. Zavadskas، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2012
Abstract :
Tunneling industry has seen great advancements in underground construction projects. Now, it has significant difference with the last two decades. In many times, tunneling projects find themselves involved in the situation where unexpected conditions threaten the continuation of project. Managers always look for a reliable technique to overcome limitations of finance and time. TOPSIS method is widely used to solve multi criteria decision making (MADM) problems. This technique assigns the best alternative among a pool of feasible alternatives. Furthermore, due to inherent uncertainties in tunneling, using fuzzy logic in order to take into account these uncertainties can be useful. In addition, new factors are introduced to promote the accuracy of risk analysis. Finally, a real world case study is presented to show the effectiveness and the accuracy of the new risk evaluation model. The results demonstrated that collapse is the riskiest parameter in Ghomroud water conveyance tunneling project.
Keywords :
Tunneling , Fuzzy topsis , Ghomroud water conveyance tunnel , risk evaluation
Journal title :
Archives of Civil and Mechanical Engineering
Journal title :
Archives of Civil and Mechanical Engineering