Title of article
Complexity and approximability of scheduling resumable proportionally deteriorating jobs
Author/Authors
Stanis?aw Gawiejnowicz، نويسنده , , Alexander Kononov، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2010
Pages
4
From page
305
To page
308
Abstract
A set of independent, resumable and proportionally deteriorating jobs is to be executed on a single machine. The machine is not continuously available for processing but the number of non-availability periods, the start time and end time of each period are known in advance. The criterion of schedule optimality is the maximum completion time. It is proved that the decision version of the problem with a single non-availability period is ordinarily NPNP-complete. It is also proved that for the problem with a single non-availability period there exists a fully polynomial-time approximation scheme. Finally, it is proved that for the problem with two or more non-availability periods there does not exist a polynomial-time approximation algorithm with a constant worst-case ratio, unless P=NP
Keywords
Scheduling , Complexity theory , Deteriorating jobs , Fully polynomial-time approximation scheme
Journal title
European Journal of Operational Research
Serial Year
2010
Journal title
European Journal of Operational Research
Record number
1312312
Link To Document