Minimum weighted number of tardy jobs on an m-machine flow-shop with a critical machine
Author/Authors
Gur Mosheiov، نويسنده , , Assaf Sarig، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2010
Pages
5
From page
404
To page
408
Abstract
We study a flow-shop problem, where each of the jobs is limited to no more than two operations. One of these operations is common for all the jobs, and is performed on the same (”critical”) machine. Reflecting many applications, jobs are assumed to be processed in blocks on the critical machine. All the jobs share a common due-date, and the objective is minimum weighted number of tardy jobs. We prove that the problem is NP-hard. Then we formulate the problem as an integer program, and introduce a pseudo-polynomial dynamic programming algorithm, proving that the problem is NP-hard in the ordinary sense. We also propose an efficient heuristic, which is shown numerically to produce very close-to-optimal schedules. Finally, we show that the special case of identical weights is polynomially solvable.
Keywords
Critical machine , Scheduling , Flow-shop , Weighted number of tardy jobs
Journal title
European Journal of Operational Research
Serial Year
2010
Journal title
European Journal of Operational Research
Record number
1312421
Link To Document