Title of article
Cut generation for an integrated employee timetabling and production scheduling problem
Author/Authors
O. Guyon، نويسنده , , P. Lemaire، نويسنده , , E. Pinson، نويسنده , , D. Rivreau، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2010
Pages
11
From page
557
To page
567
Abstract
This paper investigates the integration of the employee timetabling and production scheduling problems. At the first level, we manage a classical employee timetabling problem. At the second level, we aim at supplying a feasible production schedule for a set of interruptible tasks with qualification requirements and time-windows. Instead of hierarchically solving these two problems as in the current practice, we try here to integrate them and propose two exact methods to solve the resulting problem. The former is based on a Benders decomposition while the latter relies on a specific decomposition and a cut generation process. The relevance of these different approaches is discussed here through experimental results.
Keywords
Cut generation , Production scheduling problem , Energetic reasoning , Benders decomposition , Employee timetabling problem
Journal title
European Journal of Operational Research
Serial Year
2010
Journal title
European Journal of Operational Research
Record number
1312446
Link To Document