• Title of article

    Maximizing the net present value of a project under uncertainty

  • Author/Authors

    Wolfram Wiesemann، نويسنده , , Daniel Kuhn، نويسنده , , Berç Rustem، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2010
  • Pages
    12
  • From page
    356
  • To page
    367
  • Abstract
    We address the maximization of a project’s expected net present value when the activity durations and cash flows are described by a discrete set of alternative scenarios with associated occurrence probabilities. In this setting, the choice of scenario-independent activity start times frequently leads to infeasible schedules or severe losses in revenues. We suggest to determine an optimal target processing time policy for the project activities instead. Such a policy prescribes an activity to be started as early as possible in the realized scenario, but never before its (scenario-independent) target processing time. We formulate the resulting model as a global optimization problem and present a branch-and-bound algorithm for its solution. Extensive numerical results illustrate the suitability of the proposed policy class and the runtime behavior of the algorithm.
  • Keywords
    Project scheduling , Net present value , Optimization under uncertainty
  • Journal title
    European Journal of Operational Research
  • Serial Year
    2010
  • Journal title
    European Journal of Operational Research
  • Record number

    1312482