• Title of article

    Determining crane areas in intermodal transshipment yards: The yard partition problem

  • Author/Authors

    Nils Boysen، نويسنده , , Malte Fliedner، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2010
  • Pages
    7
  • From page
    336
  • To page
    342
  • Abstract
    At rail–road transshipment yards, gantry cranes move containers from freight trains to trucks and vice versa. They constitute important entities in today’s intermodal transportation systems. Real-world yards are often partitioned into several disjunct crane areas, so that crane interferences during container transshipment are avoided. In practice, the lengths of such crane areas are typically determined by simple rules of thumb, i.e., each crane receives an equally sized area, which might result in an unleveled division of labor among cranes and, thus, prolong train processing times. This paper provides an exact solution procedure which determines disjunct yard areas of varying size for multiple gantry cranes in polynomial runtime, so that the workload for a given pulse of trains is equally distributed among cranes. Furthermore, we investigate the potential acceleration of train processing as compared to equally sized areas in a yard simulation.
  • Keywords
    Container handling , Crane scheduling , Intermodal transport , Transshipment yard
  • Journal title
    European Journal of Operational Research
  • Serial Year
    2010
  • Journal title
    European Journal of Operational Research
  • Record number

    1312678