Title of article :
Complexity of single machine scheduling subject to nonnegative inventory constraints
Author/Authors :
Dirk Briskorn، نويسنده , , Byung-Cheon Choi، نويسنده , , Kangbok Lee، نويسنده , , Joseph Leung، نويسنده , , Michael Pinedo، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2010
Pages :
15
From page :
605
To page :
619
Abstract :
This paper focuses on single machine scheduling subject to inventory constraints. Jobs either add items to an inventory or remove items from that inventory. Jobs that have to remove items cannot be processed if the required number of items is not available. We consider scheduling problems on a single machine with the minimization of the total weighted completion time, the maximum lateness, and the number of tardy jobs, respectively, as objective and determine their computational complexity. Since the general versions of our problems turn out to be strongly NP-hard, we consider special cases by assuming that different jobs have certain parameter values in common. We determine the computational complexity for all special cases when the objective is either to minimize total completion time or to minimize maximum lateness and for several special cases when the objective is either to minimize total weighted completion time or to minimize the number of tardy jobs.
Keywords :
Polynomial-time algorithms , Machine scheduling , Inventory constraints , Computational complexity , Strong NP-hardness
Journal title :
European Journal of Operational Research
Serial Year :
2010
Journal title :
European Journal of Operational Research
Record number :
1312926
Link To Document :
بازگشت