• Title of article

    Scheduling just-in-time part supply for mixed-model assembly lines

  • Author/Authors

    Nils Boysen، نويسنده , , Stefan Bock، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    11
  • From page
    15
  • To page
    25
  • Abstract
    With increasing cost competition and product variety, providing an efficient just-in-time (JIT) supply has become one of the greatest challenges in the use of mixed-model assembly line production systems. In the present paper, therefore, we propose a new approach for scheduling JIT part supply from a central storage center. Usually, materials are stored in boxes that are allotted to the consumptive stations of the line by a forklift. For such a real-world problem, a new model, a complexity proof as well as different exact and heuristic solution procedures are provided. Furthermore, a direct comparison with a simple two-bin kanban system is provided. Such a system is currently applied in the real-world industrial process that motivates our research. It becomes obvious that this policy is considerably outperformed according to the resulting inventory- and α-service levels. Moreover, at the interface between logistics and assembly operations, strategic management implications are obtained. Specifically, based on the new approach, it is the first time a statistical analysis is being made as to whether widespread Level Scheduling policies, which are well-known from the Toyota Production System, indeed facilitate material supply. Note that in the literature it is frequently claimed that this causality exists.
  • Keywords
    Just-in-time , Scheduling , Mixed-Model Assembly Line , In-house logistics
  • Journal title
    European Journal of Operational Research
  • Serial Year
    2011
  • Journal title
    European Journal of Operational Research
  • Record number

    1313161