Title of article :
Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing
Author/Authors :
Yakup Kara، نويسنده , , Turan Paksoy، نويسنده , , Ching-Ter Chang، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2009
Abstract :
Assembly line balancing generally requires a set of acceptable solutions to the several conflicting objectives. In this study, a binary fuzzy goal programming approach is applied to assembly line balancing. Models for balancing straight and U-shaped assembly lines with fuzzy goals (the number of workstations and cycle time goals) are proposed. The binary fuzzy goal programming models are solved using the methodology introduced by Chang [Chang, C.T., 2007. Binary fuzzy goal programming. European Journal of Operational Research 180 (1), 29–37]. An illustrative example is presented to demonstrate the validity of the proposed models and to compare the performance of straight and U-shaped line configurations.
Keywords :
Binary fuzzy goal programming , Assembly line balancing , U-shaped assembly lines
Journal title :
European Journal of Operational Research
Journal title :
European Journal of Operational Research