Title of article :
A method for planning of work-flow by combined use of location-based scheduling and 4D CAD
Author/Authors :
Jongeling، نويسنده , , Rogier and Olofsson، نويسنده , , Thomas، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2007
Pages :
10
From page :
189
To page :
198
Abstract :
There is a great potential to improve the flow of resources through locations on construction sites, termed work-flow. Current activity-based scheduling techniques do not provide adequate support for the planning of work-flow due to practical and methodological reasons. Location-based scheduling techniques provide a promising alternative to activity-based scheduling techniques for planning of work-flow. However, neither location-based nor activity-based scheduling techniques provide users with insight in the spatial configuration of scheduled construction operations. A technique that can provide this insight is 4D CAD in which 3D CAD models are combined with data from construction schedules. This article presents a process method for the planning of work-flow by combined use of location-based scheduling and 4D CAD. We suggest that a location-based approach to 4D CAD can improve the usability of the 4D CAD models for work-flow analyses. In addition, the article suggests that 4D CAD can enhance the value of location-based schedules.
Keywords :
Location-based planning , Work-flow , 4D CAD
Journal title :
Automation in Construction
Serial Year :
2007
Journal title :
Automation in Construction
Record number :
1337822
Link To Document :
بازگشت