A model used in creating a work-rest schedule for laborers
Author/Authors :
Hsie، نويسنده , , Machine and Hsiao، نويسنده , , Wen-ta and Cheng، نويسنده , , Tao-ming and Chen، نويسنده , , Hsieh-Ching Chen، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2009
Pages :
8
From page :
762
To page :
769
Abstract :
This paper presents a theoretical model that can be used to create work-rest schedules for construction workers. Two objectives are proposed in the optimization processes when such schedules are created. These objectives include minimizing the time for completing jobs and minimizing any extra energy expended by laborers due to inappropriate work assignments that force them to work longer than the maximum acceptable work duration. A GA-based mechanism was developed to search the Pareto front, which is one of the effective ways for solving multiobjective optimization problems. Such a mechanism was implemented by computer programming using a numerical software tool called MATLAB. Theoretical examples demonstrated that the proposed model efficiently created work-rest schedules.
Keywords :
Work-rest schedule , Physical energy expenditure , Maximum acceptable work duration , Ergonomics , Multiobjective Optimization , Genetic algorithms
Journal title :
Automation in Construction
Serial Year :
2009
Journal title :
Automation in Construction
Record number :
1338078
Link To Document :
بازگشت