Title of article :
Entropy-based scheduling of resource-constrained construction projects
Author/Authors :
Christodoulou، نويسنده , , Symeon and Ellinas، نويسنده , , Georgios and Aslani، نويسنده , , Pooyan، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2009
Abstract :
A method is presented for resource allocation and scheduling of resource-constrained projects by use of a measure of the projectsʹ entropy. The entropy, as a measure of the degree of disorder in a system, is an indicator of a projectʹs tendency to progress out of order and into a chaotic condition and it can thus serve to forecast a projectʹs development. The entropy metric used in the analysis is based on the resource assignments per activity (required vs. assigned resource units).
Keywords :
Resource-constrained construction scheduling , entropy
Journal title :
Automation in Construction
Journal title :
Automation in Construction