• Title of article

    Optimizing schedule for improving the traffic impact of work zone on roads

  • Author/Authors

    Lee، نويسنده , , Hsin-Yun، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2009
  • Pages
    11
  • From page
    1034
  • To page
    1044
  • Abstract
    Many different types of construction projects set up work zones on roads. Especially in urban areas, lane closures as a result of work zones have a considerable impact on local traffic. However, for a construction project that consists of several work zones and several work crews, the traffic impact may be improved by appropriate scheduling. Therefore, this paper proposed a scheduling model based on the route-changing behavior of road users. The proposed model calculates the traffic delay of vehicles by microscopic simulation, and applies team ant colony optimization to search for a near-optimal schedule. The project planner then ensures that the contractor executes the activities according to the near-optimal schedule. The proposed model is applied to schedule a sewer system construction project in a city. The results of our study indicate that with our proposed model the total traffic delay is reduced by 11.1% when compared with a schedule proposed by the project planner.
  • Keywords
    work zone , Traffic impact , Road user behavior , Ant Colony Optimization , Microscopic Simulation
  • Journal title
    Automation in Construction
  • Serial Year
    2009
  • Journal title
    Automation in Construction
  • Record number

    1338128