    Using the MD CAD model to develop the time–cost integrated schedule for construction projects

  • Author/Authors

    Feng، نويسنده , , Chung-wei and Chen، نويسنده , , Yi-Jao and Huang، نويسنده , , Jiun-Ru، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2010
  • Pages
    10
  • From page
    347
  • To page
    356
  • Abstract
    Time and cost are two critical factors determining the success of a construction project. However, it is still a daunting task for project planners to develop a time–cost integrated schedule due to the tremendous amount of information that need to be processed. Various research efforts have been made to develop model-based systems to facilitate information processing and integrate time and cost throughout the project life cycle. However, the results of the previous studies are not comprehensive enough to fulfill the requirements of project management. This paper presents a scheduling system that applies Multi-Dimensional (MD) CAD model, Object Sequencing Matrix (OSM), and genetic algorithms (GAs) to generate the time–cost integrated schedule for the construction project. A computer implementation called MD CAD model-based Project Scheduling System (MD_PSS) is also developed to verify the feasibility of the proposed approach.
  • Keywords
    MD CAD model , project scheduling , Genetic algorithms (GAs)
  • Journal title
    Automation in Construction
  • Serial Year
    2010
  • Journal title
    Automation in Construction
  • Record number

    1338176