• Title of article

    Optimizing linear project scheduling with multi-skilled crews

  • Author/Authors

    Liu، نويسنده , , Shu-Shun and Wang، نويسنده , , Chang-Jung، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2012
  • Pages
    8
  • From page
    16
  • To page
    23
  • Abstract
    Given the characteristics of linear construction projects, considerable research has been devoted to work productivity and continuity. However, most of these studies only consider single-skilled crews working on linear projects, neglecting the flexibility of multi-skilling in construction. Recently, researchers have revealed that multi-skilling in construction can lead to increased productivity, flexibility, and work continuity. Therefore, this study proposes a duration optimization model while introducing the concept of multi-skilling to integrate single/multiple-skilled crews to improve work performance. Moreover, to enhance the efficiency of problem solving, constraint programming (CP) is used to handle complicated combinatorial scheduling problems, and several heuristic rules involving schedules are engaged. The CP-based optimization minimizes project duration while two crew types, including single-skilled and multi-skilled crews, are integrated in the proposed model. A bridge example is used for several scenarios to illustrate the proposed modelʹs handling of linear scheduling problems, demonstrating how multi-skilling can be used to optimize project duration and improve work continuity/efficiency in a construction context.
  • Keywords
    Linear project scheduling , Multi-skilling , Constraint programming
  • Journal title
    Automation in Construction
  • Serial Year
    2012
  • Journal title
    Automation in Construction
  • Record number

    1338492