Modeling and analysis of thrust force for EPB shield tunneling machine
Author/Authors :
Wang، نويسنده , , Lintao and Gong، نويسنده , , Guofang and Shi، نويسنده , , Hu Wen-Yang، نويسنده , , Huayong، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2012
Pages :
9
From page :
138
To page :
146
Abstract :
Thrust force is an important parameter for the design and operation of earth pressure balance (EPB) shield tunneling machine. The analysis of in-situ data indicates that the conventional thrust force estimation model based on an empirical equation gives rather rough result. In order to reduce uncertainties, composition analysis and corresponding calculation of thrust force are proposed. Laboratory test with a Φ1.8 m EPB shield tunneling machine and calculation result of the new model have been compared. The new model has been improved step by step based on experimental result as well as the further analysis of the working principle of shield excavation. The relative error between the experimental thrust force and the calculation result with the final model is reduced to 3% at the smooth stage and 4% at the trembling stage. The influences of cutting ratio, hatch ratio and equivalent earth pressure on the total thrust force have been investigated.
Keywords :
EPB shield tunneling machine , Thrust force , Cutting ratio , Earth Pressure , Hatch ratio
Journal title :
Automation in Construction
Serial Year :
2012
Journal title :
Automation in Construction
Record number :
1338544
Link To Document :
بازگشت