Title of article
Onsite 3D marking for construction activity tracking
Author/Authors
Shahi، نويسنده , , Arash and West، نويسنده , , Jeffrey S. and Haas، نويسنده , , Carl T.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2013
Pages
8
From page
136
To page
143
Abstract
This article presents an innovative onsite 3D marking approach for tracking the progress of construction activities using an Ultra Wide Band (UWB) positioning system. The 3D marking approach is used to track activities that could not be tracked previously using object-based tracking models, including welding and inspection activities for pipelines. A field experimentation study on an industrial-type building construction project was conducted to demonstrate the method and evaluate its performance in a construction environment and a software application was developed using MATLAB to automate the data analysis and progress estimation procedure. The results of the field experiments confirmed the feasibility of the developed 3D marking approach for tracking a number of construction activities, such as welding and inspection, which are not associated with the addition or movement of objects on a site and therefore could not be tracked using traditional object-based models.
Keywords
piping , Material tracking , Data fusion , UWB , Indoor construction , Experimental , Activity tracking , Field implementation , Progress estimation , Performance
Journal title
Automation in Construction
Serial Year
2013
Journal title
Automation in Construction
Record number
1338590
Link To Document