Author/Authors :
Conrad، نويسنده , , R and Bakker، نويسنده , , K and Chabrol، نويسنده , , C and Fütterer، نويسنده , , M.A and van der Laan، نويسنده , , J.G and Rigal، نويسنده , , E and Stijkel، نويسنده , , M.P، نويسنده ,
Abstract :
Two new irradiation projects are being performed at the HFR Petten, named EXOTIC-8.9 and EXOTIC-8.10. Issues such as tritium release from candidate ceramic breeder pebbles for the HCPB blanket and tritium permeation through cooling tubes of the WCLL blanket are investigated simultaneously. In EXOTIC-8.9, the tritium release behaviour of a Li2TiO3 pebble bed is measured along with the tritium-permeation rate through a double-wall tube (DWT) of T91 with a Cu interlayer. In EXOTIC-8.10, the tritium release behaviour of a Li4SiO4 pebble bed is measured along with the tritium permeation rate through a T91 tube with a Fe–Al/Al2O3 coating as tritium permeation barrier (TPB). Tritium permeation phenomena are studied by variations of temperatures and purge gas conditions. This paper reports on the results of the first 100 irradiation days.