• Title of article

    An introduction to RAM analysis of EPB tunnel boring machine

  • Author/Authors

    Amini Khoshalan، H. نويسنده PhD student of Mining engineering, Shahrood University of Technology, Shahrood, Iran. , , Torabi، S.R نويسنده , , Hoseinie، S.H. نويسنده Assist. Prof., Hamadan University of Technology, Hamadan, Iran , , Ghodrati، B. نويسنده Prof., Division of Operation and Maintenance Engineering, Lulea University of Technology, Lulea, Sweden ,

  • Issue Information
    روزنامه با شماره پیاپی 0 سال 2014
  • Pages
    8
  • From page
    120
  • To page
    127
  • Abstract
    Earth pressure balance tunnel boring machines (EPB - TBMs) are favorably used in construction of tunnels in urban areas. These more expensive machines with high operational costs require an exclusive study and knowledge on these machine components and subsystems and their failure and downtimes for time planning, cost control and performance prediction with a high accuracy. For achieving these aims, guidelines for reliability, availability and maintainability (RAM) analysis of an EPB machine are completely expressed in present study. Gathering and recording all daily failure and repair times and other maintenance tasks, dividing the machine into subsystems (including mechanical subsystem, electrical subsystem, hydraulic subsystem, pneumatic subsystem and water subsystem), graphical tests (trend test and correlation test), statistical tests and analysis are discussed in detail. Therefore, RAM analysis can be applied for EPB-TBMs in all mechanized tunneling projects and it is suggested to the tunneling communities and companies to fix these instructions in their programs.
  • Journal title
    Scientific Journal of Pure and Applied Sciences
  • Serial Year
    2014
  • Journal title
    Scientific Journal of Pure and Applied Sciences
  • Record number

    1415253