Title of article
Scheduling flexible flowshops with unit-time operations and minimum time delays
Author/Authors
Rebaine، نويسنده , , Djamal، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2010
Pages
8
From page
1193
To page
1200
Abstract
In this paper, we consider the flexible flowshop problem with unit-time operations and minimum time delays. We present two simple heuristic algorithms to solve this problem along with their worst-case analyses.
Keywords
Hybrid flow shop , Scheduling , Time delays , Makespan
Journal title
Electronic Notes in Discrete Mathematics
Serial Year
2010
Journal title
Electronic Notes in Discrete Mathematics
Record number
1455599
Link To Document