Title of article :
Scheduling flexible flowshops with unit-time operations and minimum time delays
Author/Authors :
Rebaine، نويسنده , , Djamal، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2010
Pages :
8
From page :
1193
To page :
1200
Abstract :
In this paper, we consider the flexible flowshop problem with unit-time operations and minimum time delays. We present two simple heuristic algorithms to solve this problem along with their worst-case analyses.
Keywords :
Hybrid flow shop , Scheduling , Time delays , Makespan
Journal title :
Electronic Notes in Discrete Mathematics
Serial Year :
2010
Journal title :
Electronic Notes in Discrete Mathematics
Record number :
1455599
Link To Document :
بازگشت