• Title of article

    Development of hydropower energy in Turkey: The case of اoruh river basin

  • Author/Authors

    Akp?nar، نويسنده , , Adem and K?mürcü، نويسنده , , Murat ?hsan and Kankal، نويسنده , , Murat، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    9
  • From page
    1201
  • To page
    1209
  • Abstract
    The main objective in doing the present study is to investigate the sustainable development of hydropower plants in the Çoruh river basin of Turkey, which is least problem river of Turkey in respect to international cooperation as compared with Turkeyʹs other trans-boundary waters. Initial studies concerning the hydropower production potential in Çoruh basin had been carried out by Turkish authorities in the late 1960s. Total installed power capacity and annual average energy generation of 37 dams and run of river (without storage) hydropower plants developed at various project stages by The Electrical Power Resources Survey and Development Administration (EİE) in Çoruh basin are 3132.70 MW and 10.55 TWh/yr, respectively. Today, this generation value corresponds 6.45% of Turkeyʹs energy consumption in 2006 while it meets 6.3% of total electricity energy production of Turkey which is equal to 167.9 TWh/yr in 2006. Besides, this potential developed at various project stages in Çoruh basin will provide 24.1% of Turkeyʹs hydroelectric energy generation being equal to 43.8 TWh/yr in 2006.
  • Keywords
    hydropower , The اoruh river basin , The اoruh Basin Development Plan
  • Journal title
    Renewable and Sustainable Energy Reviews
  • Serial Year
    2011
  • Journal title
    Renewable and Sustainable Energy Reviews
  • Record number

    1499737