Title of article
Optimisation of construction site layout using a hybrid simulation-based system
Author/Authors
Zhou، نويسنده , , F. and AbouRizk، نويسنده , , S.M. and AL-Battaineh، نويسنده , , H.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2009
Pages
16
From page
348
To page
363
Abstract
The layout of temporary facilities for a construction project greatly impacts project performance as demonstrated in many prior studies. This paper demonstrates how the site layout process can be automated for specific types of construction. Utility tunnel construction was selected as the specialty area, for which a partially automated site layout application was built. This approach integrates general purpose simulation for modelling space, logistics and resource dynamics with genetic algorithms for optimizing the layout based on various constraints and rules. We achieve this by implementing a site layout optimisation system within a simulation environment which already models tunnel construction processes. The new modelling strategy provides a medium for seamless integration between the resulting site layout and the discrete event production simulation models. The paper describes the approach taken and the system developed, presenting a practical case study from a tunnelling project in Edmonton, Canada to illustrate the system’s performance and its validation.
Keywords
site preparation , Tunnel construction , Algorithms , Optimisation , Construction planning
Journal title
Simulation Modelling Practice and Theory
Serial Year
2009
Journal title
Simulation Modelling Practice and Theory
Record number
1581267