• Title of article

    Balancing and simulating of assembly line with overlapped and stopped operation

  • Author/Authors

    Fan، نويسنده , , Wenhui and Gao، نويسنده , , Zhenxiao and Xu، نويسنده , , Weida and Xiao، نويسنده , , Tianyuan، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2010
  • Pages
    11
  • From page
    1069
  • To page
    1079
  • Abstract
    In order to avoid undesirable idling or fuss of the manufacturing resources, the assembly workshop’s scheduler evaluates the effect of different online sequence of parts on production cycle, balances workload and utilization ratio, minimizes span of the assembly line. This paper studies modeling and simulation of assembly line with overlapped and stopped operation, builds mathematical model for the assembly line both under certainty and uncertainty environment. Assembly line problem with these two conditions is simulated, and a simulation prototype system is developed. The assembly line simulation at assembly workshop in an auto company of Beijing validates the effectiveness and correctness of the prototype system.
  • Keywords
    Assembly line , Overlapped and stopped operation , Balancing and simulating
  • Journal title
    Simulation Modelling Practice and Theory
  • Serial Year
    2010
  • Journal title
    Simulation Modelling Practice and Theory
  • Record number

    1581765