Title of article :
Balancing and simulating of assembly line with overlapped and stopped operation
Author/Authors :
Fan، نويسنده , , Wenhui and Gao، نويسنده , , Zhenxiao and Xu، نويسنده , , Weida and Xiao، نويسنده , , Tianyuan، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2010
Pages :
11
From page :
1069
To page :
1079
Abstract :
In order to avoid undesirable idling or fuss of the manufacturing resources, the assembly workshop’s scheduler evaluates the effect of different online sequence of parts on production cycle, balances workload and utilization ratio, minimizes span of the assembly line. This paper studies modeling and simulation of assembly line with overlapped and stopped operation, builds mathematical model for the assembly line both under certainty and uncertainty environment. Assembly line problem with these two conditions is simulated, and a simulation prototype system is developed. The assembly line simulation at assembly workshop in an auto company of Beijing validates the effectiveness and correctness of the prototype system.
Keywords :
Assembly line , Overlapped and stopped operation , Balancing and simulating
Journal title :
Simulation Modelling Practice and Theory
Serial Year :
2010
Journal title :
Simulation Modelling Practice and Theory
Record number :
1581765
Link To Document :
بازگشت