Title of article
A simulation based comparison: Manual and automatic distribution setup in a textile yarn rewinding unit of a yarn dyeing factory
Author/Authors
Brahmadeep and Thomassey، نويسنده , , Sébastien، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2014
Pages
11
From page
80
To page
90
Abstract
This paper aims to explain the production flow and the distribution logic of bobbins for rewinding process in a yarn dyeing factory, comparing the different scenarios of production (manual and automatic) using the computer simulation tools. The goal of this project is to build a model in which all the involved processes can be simulated with the consideration of all the parameters and constraints. The simulation model is used as a tool for the comparison of present manual setup and future automated setup for the production management of bobbin distribution in yarn rewinding process in terms of delays and costs. Since, the manual operation involves defaults, improper time management, errors and with the growing competitiveness globally, the companies in Europe need to automate as much as possible their production lines. The expected impacts are to increase the productivity and profitability, to have the possibility to customize the production, to develop production tools, implementation of the lean manufacturing tools.
Keywords
Automation , Setup comparison , Internal supply chain , Arena Simulation , Lean tools , Simulation model
Journal title
Simulation Modelling Practice and Theory
Serial Year
2014
Journal title
Simulation Modelling Practice and Theory
Record number
1583078
Link To Document