Title of article
Multireservoir real-time operations for flood control using balanced water level index method
Author/Authors
Wei، نويسنده , , Chih-Chiang and Hsu، نويسنده , , Nien-Sheng، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2008
Pages
16
From page
1624
To page
1639
Abstract
This paper presents a real-time simulation-optimization operation procedure for determining the reservoir releases at each time step during a flood. The proposed procedure involves two models, i.e., a hydrological forecasting model and a reservoir operation model. In the reservoir operation model, this paper compares two flood-control operation strategies for a multipurpose multireservoir system. While Strategy 1 is the real-time joint reservoir operations without using the balanced water level index (BWLI) method, Strategy 2 involves real-time joint reservoir operations using the BWLI method. The two strategies presented are formulated as mixed-integer linear programming (MILP) problems. The idea of using the BWLI method is derived from the HEC-5 program developed by the US Army Corps of Engineers. The proposed procedure has been applied to the Tanshui River Basin system in Taiwan using the 6 h ahead forecast data of six typhoons. A comparison of the results obtained from the two strategies reveals that Strategy 2 performs much better than Strategy 1 in determining the reservoir real-time releases throughout the system during flood emergencies in order to minimize flooding, while maintaining all reservoirs in the system in balance if possible. Consequently, the proposed model using the BWLI method demonstrates its effectiveness in estimating real-time releases.
Keywords
Reservoir , Balanced water level index , Typhoon , Real-time operation , Flood control
Journal title
Journal of Environmental Management
Serial Year
2008
Journal title
Journal of Environmental Management
Record number
1585541
Link To Document