Title of article :
A semi-infinite programming model for earliness/tardiness production planning with simulated annealing
Author/Authors :
Li، نويسنده , , Y and Wang، نويسنده , , D، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1997
Abstract :
To describe the earliness/tardiness production planning problems in the JIT environment, a nonlinear semi-infinite programming model was proposed in [1]. Due to a nonconvex objective function and infinitely many constraints, the model is difficult to solve by traditional methods. In this paper, simulated annealing method combined with a heuristic and the steepest descent method is developed. Numerical results shows that the present approach is very efficient. In theory, the developed method is an attempt to solve a continuous domain problem by simulated annealing.
Keywords :
Earliness/tardiness schedule , Semi-infinite programming , heuristic , SIMULATED ANNEALING
Journal title :
Mathematical and Computer Modelling
Journal title :
Mathematical and Computer Modelling