    Cost evaluation of I&C upgrade approach in nuclear power plants

  • Author/Authors

    Kang، نويسنده , , Hyun-Tae and Lee، نويسنده , , Jae-Ki، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2013
  • Pages
    7
  • From page
    424
  • To page
    430
  • Abstract
    Utilities have recently been debating the respective pros and cons of implementation of a multi-phase upgrade during several normal outages versus a single major upgrade implementation during a prolonged outage. We have studied these approaches and have been developing the basic design of nuclear power plants (NPPs) instrumentation and control (I&C) upgrade since early 2008. As part of this study, analyses of the NPPs I&C systems were conducted and the need for upgrading the systems was raised. One of the primary concerns regarding the system upgrade is a cost-benefit implementation, which will influence the upgrade approach. From this viewpoint, the I&C upgrade must consider economic factors such as I&C vendor cost, architecture engineering cost, installation cost, utility cost, and other transition costs such as training and procedure development. This paper presents a comparison study of economical aspects including cost evaluation between the aforementioned upgrade implementations and suggests a solution for I&C upgrade approach.
  • Journal title
    Nuclear Engineering and Design Eslah
  • Serial Year
    2013
  • Journal title
    Nuclear Engineering and Design Eslah
  • Record number

    1593692