Title of article :
Safety verification for the ECCS driven by the electrically 4 trains during LBLOCA reflood phase using ATLAS
Issue Information :
روزنامه با شماره پیاپی سال 2014
Abstract :
The APR1400 is equipped with four safety injection pumps driven by two emergency diesel generators. However, the design has been changed so that the four safety injection pumps are driven by 4 emergency diesel generators during the design certification process from the U.S. NRC. Thus, 4 safety injection pumps (SIPs) are completely independent electrically and mechanically and three safety injection pumps are available in a single failure condition. This design change could have a certain effects on the thermal-hydraulic phenomenon occurring in the downcomer region during the late reflood phase of a large break loss of coolant accident (LBLOCA).
in this study, a verification experiment for the reflood phase of a LBLOCA was performed to evaluate the core cooling performance of the 4 train emergency core cooling system (ECCS) with an assumption of a single failure. And the different combinations of three SIPs positions were tested to investigate the asymmetric effects on the reactor core cooling performance.
erall experimental results revealed the typical thermal–hydraulic trends expected to occur during the reflood phase of a large-break LOCA scenario for the APR1400. Experiment with the injection of three SIPs showed a faster core quenching time and lower bypass ratio than that of the case in which two SIPs were injected. The RPV wall temperature distributions showed the similar trend in spite of the different SIP combinations.
Journal title :
Nuclear Engineering and Design Eslah
Journal title :
Nuclear Engineering and Design Eslah