Title of article
The Development and First Results in Commissioning Systems for Preparing and Supplying Fuel and Bed Filler to a BKZ 420-140 KS Boiler
Author/Authors
Vtyurin، Yu. N. نويسنده , , Konovalov، V. V. نويسنده , , Kurilkin، V. G. نويسنده , , Raspopov، I. V. نويسنده , , Kravtsov، Yu. G. نويسنده , , Motorin، A. V. نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 1999
Pages
-690
From page
691
To page
0
Abstract
Results are presented of the first stage of commissioning of the nonstandard equipment of the systems for preparing and supplying fuel and bed filler to the sections of a BKZ 420-140 KS boiler with a bubbling fluidized bed.
Keywords
structure & design , maintenance & inspection , structural frameworks , Buildings
Journal title
Thermal Engineering
Serial Year
1999
Journal title
Thermal Engineering
Record number
17469
Link To Document