Title of article
Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
Author/Authors
اصغري ، محمد نويسنده Asghari Jaafar-abadi, M , نژادعلي، سمانه نويسنده MSc, Department of Management, Iran Chamber of Commerce, Industries and Mines, Mashhad, Iran Nezhadali , Samaneh
Issue Information
فصلنامه با شماره پیاپی 0 سال 2014
Pages
13
From page
61
To page
73
Abstract
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for appraising a multi-objective programing that minimize total weighted tardiness, earliness and total flowtime with fuzzy parameters on parallel machines, simultaneously with respect to the impact of machine deterioration. Besides, in this paper attempted to present a defuzzification approach and a heuristic method based on genetic algorithm (GA) to solve the proposed model. Finally, several dominant properties of optimal solutions are demonstrated in comparison with the results of a state-of-the-art commercial solver and the simulated annealing method that is followed by illustrating some instances for indicating validity and efficiency of the method.
Journal title
Journal of Optimization in Industrial Engineering
Serial Year
2014
Journal title
Journal of Optimization in Industrial Engineering
Record number
1811847
Link To Document