Title of article
Contractor Selection Using Fuzzy Hybrid AHP-VIKOR
Author/Authors
Zamani، S. نويسنده Department of Industrial Engineering, Islamic Azad University-South Tehran Branch,Tehran, Iran. , , Farughi، H. نويسنده Department of Industrial Engineering, University of Kurdistan, Sanandaj, Iran. , , Soolaki، M. نويسنده Department of Industrial Engineering, University of Kurdistan, Sanandaj, Iran. ,
Issue Information
روزنامه با شماره پیاپی سال 2013
Pages
15
From page
26
To page
40
Abstract
In recent years, contractors play a major role in construction projects
of buildings, roads, or waterworks under supervision of project owners
or employers of these projects. So, that is why contractor selection is
an important decision for employers. Contractor selection is a multicriterion
decision problem and resolving the problem of evaluation
and although ranking the candidate contractors has become a key
factor for firms and enterprises. In this article, the proposed a new
hybrid AHP and VIKOR methodology is applied to select the best
contractor. Because of dealing with uncertain values for the criteria,
Fuzzy logic is used to solve this problem and the evaluation data for
the alternatives have been expressed in linguistic terms. So, both AHP
and VIKOR methods are performed under fuzzy environment. The
fuzzy AHP is applied to form the structure of the contractor selection
problem and also to obtain weights of the evaluation criteria, and
fuzzy VIKOR method is used to determine final ranking. A numerical
example is proposed to illustrate an application of the proposed
method that demonstrates the effectiveness of the proposed model.
Journal title
International Journal of Research in Industrial Engineering
Serial Year
2013
Journal title
International Journal of Research in Industrial Engineering
Record number
1814119
Link To Document