Title of article
A time-dependent earned value model for software projects
Author/Authors
Warburton، نويسنده , , Roger D.H.، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2011
Pages
9
From page
1082
To page
1090
Abstract
This paper proposes a formal method for including time dependence into Earned Value (EV) management. The model requires three parameters, which map directly to the fundamental “triple constraint” of scope, cost, and schedule: the reject rate of activities, the cost overrun parameter, and the time to repair the rejected activities. Time dependent expressions for the planned value, earned value, and actual cost are derived, along with the cost performance index (CPI) and schedule performance index (SPI). The model is built on the well-established Putnam–Norden–Rayleigh (PNR) labor rate profile, which is a useful representation for large software projects. We apply the model to a well-known software dataset, demonstrating how to estimate the projectʹs final cost, which converges faster to the correct answer with less variability than standard Estimate-at-Completion (EAC) calculations. The model also accurately predicts the required revised labor profile and the new schedule.
Keywords
Earned value management , Cost Estimation , SPI , CPI
Journal title
International Journal of Project Management
Serial Year
2011
Journal title
International Journal of Project Management
Record number
1840451
Link To Document