The effect of relationship management on project performance in construction
Author/Authors
Meng، نويسنده , , Xianhai، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2012
Pages
11
From page
188
To page
198
Abstract
Construction projects often suffer from poor performance in terms of time delays, cost overruns and quality defects. The causes of poor performance have often been analysed. However, few studies have addressed the influence of supply chain relationships on project performance in construction. To fill in this gap, a questionnaire survey is carried out in the UK construction industry to explore the specific characteristics of supply chain relationships in construction and to assess their impact on project performance. In this study, a supply chain relationship is described by key indicators in ten areas: mutual objectives, gain and pain sharing, trust, no-blame culture, joint working, communication, problem solving, risk allocation, performance measurement, and continuous improvement. The analysis reveals that the deterioration of the relationship between project parties may increase the likelihood of poor performance. Poor performance can be effectively reduced by improving some aspects of the relationship. The adoption of supply chain collaboration and partnering helps to solve the performance problems, in which a long-term collaboration is more favourable for performance improvement than a short-term collaboration. In addition to the questionnaire survey, a series of industrial experts are interviewed to provide a deeper insight into the effect of relationship management on project performance.
Keywords
cost overrun , Supply chain , relationship management , Construction project , Quality defect , time delay
Journal title
International Journal of Project Management
Serial Year
2012
Journal title
International Journal of Project Management
Record number
1840483
Link To Document