Title of article :
Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project
Author/Authors :
Xu، نويسنده , , Jiuping and Zheng، نويسنده , , Huan and Zeng، نويسنده , , Ziqiang and Wu، نويسنده , , Shiyong and Shen، نويسنده , , Manbin، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2012
Abstract :
This paper presents a discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty. A multi-objective decision making model is established in which the total project duration is regarded as a fuzzy variable. To deal with the uncertainty, the fuzzy numbers in the model are defuzzified by using an expected value operator with an optimistic–pessimistic index. The objective functions are to minimize the total project cost, project duration, crashing cost, and environmental impact. Furthermore, a fuzzy-based adaptive-hybrid genetic algorithm is developed to find feasible solutions. The one-point crossover and repairing strategy for mutations are designed to avoid infeasible solutions. Finally, the Jinping-II Hydroelectric Project is used as a practical example to demonstrate the practicality and efficiency of the model. Results and a sensitivity analysis are presented to highlight the performance of the optimization method, which proves to be very effective and efficient compared to other algorithms.
Keywords :
Time–cost–environment , Construction project , genetic algorithm , Trade-off , FUZZY
Journal title :
International Journal of Project Management