Impact of sensitivity information on the prediction of projectʹs duration using earned schedule method
Author/Authors
Fayez ElShaer، نويسنده , , Raafat، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2013
Pages
10
From page
579
To page
588
Abstract
Recently, the prediction of project duration has been investigated in earned value management (EVM) using three earned value methods, planed value (PVM), earned duration (EDM) and earned schedule (ESM). The investigation has shown that ESM method outperforms on average the other two methods and fails in case of wrong warning coming from non-critical activities which suffer from delays and/or ahead of schedule. The objective of this paper is twofold: first, we study the impact of the activitiesʹ sensitivity information on the forecasting accuracy of the ESM method. Second, we test the claim that in normal conditions the project performance indicator provided by ESM at higher work breakdown structure is reliable. More precisely, activity based sensitivity measures are used as weighing parameters of the activities to improve the schedule performance of a project by removing or decreasing the negative effect of wrong warning of the non-critical activities. The computational results of a simulation study on a big benchmark projects reveal that the sensitivity information are capable of improving the forecasting accuracy of the ESM method.
Keywords
Critical activities , Time sensitivity measures , Earned value management , Project duration forecasting , Earned schedule
Journal title
International Journal of Project Management
Serial Year
2013
Journal title
International Journal of Project Management
Record number
1840684
Link To Document