Title of article :
Assessing risk management capability of contractors in subway projects in mainland China
Author/Authors :
Mu، نويسنده , , Shiyu and Cheng، نويسنده , , Hu and Chohr، نويسنده , , Mohamed and Peng، نويسنده , , Wei، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2014
Pages :
9
From page :
452
To page :
460
Abstract :
Contractorʹs risk management capability (RMC) reflects the sophistication of contractorʹs understanding of risk portfolio and how to manage those risks. This paper aims to develop a RMC assessment model for subway project contractors and to assess the current overall RMC of subway project contractors in mainland China. To achieve the objectives, a questionnaire survey was conducted and data were collected from 58 respondents. The empirical research findings showed that the overall RMC of subway project contractors can be regarded as between “low” and “medium”. In addition, currently in subway projectsʹ area, contactorʹs risk analysis capability is relatively more mature than other capabilities. However, contractorsʹ risk management attitude is relatively less mature than other capabilities. Assessing the current RMC of subway project contractors can be used to identify the priority or weakest areas needed for improvement.
Keywords :
Fuzzy synthetic evaluation , Contractor , Mainland China , Risk management capability , Subway project
Journal title :
International Journal of Project Management
Serial Year :
2014
Journal title :
International Journal of Project Management
Record number :
1840835
Link To Document :
بازگشت