• Title of article

    Earned readiness management for scheduling, monitoring and evaluating the development of complex product systems

  • Author/Authors

    Magnaye، نويسنده , , Romulo and Sauser، نويسنده , , Brian and Patanakul، نويسنده , , Peerasit and Nowicki، نويسنده , , David and Randall، نويسنده , , Wesley، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2014
  • Pages
    14
  • From page
    1246
  • To page
    1259
  • Abstract
    How should the development of a complex product system (CPS) be managed in a manner that focuses on process milestones, which is responsive to changes in technology and requirements; based on maturity measures; and applied in an interactive manner, in addition to facilitating timely feedback? This is considered to be an important question in project management. Project management tools and techniques have been inadequate for monitoring technology development in a CPS. If the technologies are not properly matured by a specific period of time, the progress of the project can be in detriment. To address this important gap, the objective of this study is to develop a new maturity-focused methodology for scheduling, monitoring and evaluating the development of a system. We present Earned Readiness Management (ERM) for system scheduling, monitoring and evaluation which was developed and validated using a case study. Future research on ERM is also discussed in this paper.
  • Keywords
    Earned readiness management , IRL , System readiness level , SRL , Technology readiness level , Integration readiness level , Control , TRL , Monitoring , Scheduling
  • Journal title
    International Journal of Project Management
  • Serial Year
    2014
  • Journal title
    International Journal of Project Management
  • Record number

    1840913