Title of article
Earned readiness management for scheduling, monitoring and evaluating the development of complex product systems
Author/Authors
Magnaye، نويسنده , , Romulo and Sauser، نويسنده , , Brian and Patanakul، نويسنده , , Peerasit and Nowicki، نويسنده , , David and Randall، نويسنده , , Wesley، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2014
Pages
14
From page
1246
To page
1259
Abstract
How should the development of a complex product system (CPS) be managed in a manner that focuses on process milestones, which is responsive to changes in technology and requirements; based on maturity measures; and applied in an interactive manner, in addition to facilitating timely feedback? This is considered to be an important question in project management. Project management tools and techniques have been inadequate for monitoring technology development in a CPS. If the technologies are not properly matured by a specific period of time, the progress of the project can be in detriment. To address this important gap, the objective of this study is to develop a new maturity-focused methodology for scheduling, monitoring and evaluating the development of a system. We present Earned Readiness Management (ERM) for system scheduling, monitoring and evaluation which was developed and validated using a case study. Future research on ERM is also discussed in this paper.
Keywords
Earned readiness management , IRL , System readiness level , SRL , Technology readiness level , Integration readiness level , Control , TRL , Monitoring , Scheduling
Journal title
International Journal of Project Management
Serial Year
2014
Journal title
International Journal of Project Management
Record number
1840913
Link To Document