• Title of article

    Evaluation of a biologically-based filtration water reclamation plant for removing emerging contaminants: A pilot plant study

  • Author/Authors

    Matamoros، نويسنده , , Vيctor and Sala، نويسنده , , Lluيs and Salvadَ، نويسنده , , Victٍria، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2012
  • Pages
    7
  • From page
    243
  • To page
    249
  • Abstract
    The effect of hydraulic retention time (HRT), solar radiation and seasonality on the removal efficiency of 18 emerging contaminants has been studied in a biological filtration pilot plant based on Daphnia sp. The pilot plant consisted of a homogenization tank and two lines, A and B, each with four 1 m3 tanks. One of these lines was directly exposed to sunlight whereas the other line was covered. Our results suggest that biodegradation and photodegradation are the most important removal pathways, whereas sorption makes a minor contribution. The removal efficiency ranged from no detectable removal to more than 90%. The kinetics of the degradation process was fit to a first order kinetic, with half-lives from 0.6 to 42 days, depending on the particular compound. However, a scaling effect comes into play as the pilot plant was found to be more efficient than a similar full-scale polishing pond.
  • Keywords
    Emerging contaminants , Reclaimed water , biological filtration , removal efficiency , Photodegradation
  • Journal title
    Bioresource Technology
  • Serial Year
    2012
  • Journal title
    Bioresource Technology
  • Record number

    1926417